Charlotte Road – Shoreditch

Set in the heart of Shoreditch Charlotte Road was a project that presented a lot of technical challenges.

Set in the heart of Shoreditch Charlotte Road was a project that presented a lot of technical challenges. We needed to counter lever scaffold to the side and rear elevations and erect a large temporary roof which we covered using a shrink wrapping system which was a successful solution. The site also required the use of internal crash decks, lift shaft scaffolds, staircase and other intricate aspects. We excelled and met all challenges and tasks with enthusiasm and confidence. The job was delivered on time and to a high standard, the feedback from the client was very good.

Project Details

 Shoreditch – Charlotte Road